John, an electrical engineering student, presented to the team his progress with two pivotal processes in the functionality of the satellite. John described the design of the startup sequence; the order in which components turn on after the satellite powers on for the very first time. John also introduced the design of NEUDOSE's WatchDog Timer. This circuit checks for computer malfunctions that can hinder the satellite's performance.